Pipe and tube bender training checklist
Jump to navigation
Jump to search
Shop Area: Metal Shop Tool: Pipe and Tube Bender |
Procedure Number TC 130-10, Rev. 0 |
Date 4/25/2021 |
GENERAL
Training to be completed prior to using the Di-Acro Manual Bender.
SAFETY
See Pipe and Tube Bender User Guide UG 130-10 [File:https://vector-space.org/wiki/index.php?title=Pipe_and_tube_bender_training_checklist&action=edit]
REFERENCE
- Pipe and Tube Bender User Guide UG 130-10 [File:https://vector-space.org/wiki/index.php?title=Pipe_and_tube_bender_training_checklist&action=edit]
- Pipe and Tube Bender Maintenance and Specifications MT 130-10 [File:https://vector-space.org/wiki/Pipe_and_tube_bender_maintenance_and_specifications]
- Pipe bending tutorial: https://vimeo.com/75913375
LISTING
√ Indicates review completed
|
Training Completion:
Vector Space User:
Date training completed:
Vector Space Trainer:
END OF THE PROCEDURE